Commercial backup power · Dallas–Fort Worth
Oncor / Primoris Commercial Generator Electrical Work
Kinzler commercial generator project experience: Kohler equipment, electrical shutdown coordination and programming coordination with the generator service team.
Discuss commercial backup powerInstallation and coordination; photo shows site work in progress
The electrical scope
Commercial generator work involves more than placing equipment. On the Oncor / Primoris project, Kinzler’s electrical coordination included a shutdown and follow-through with the generator service team. The project connects physical installation, facility power and equipment programming across separate work stages.
- May 2025 project correspondence documented generator installation and checklist completion, with fuel and startup steps still to follow.
- Kinzler reported the electrical shutdown completed in October 2025 and coordinated the next programming visit with Loftin.
- The project included subsequent service follow-up. Installation, programming and ongoing service are distinct responsibilities; the photograph does not establish final acceptance or uninterrupted operation.

Planning similar work
For a commercial owner or general contractor, the practical planning issue is defining who owns each interface: electrical connections, shutdown access, fuel, startup, programming and service. Kinzler reviews the electrical scope with the project team so those responsibilities can be identified before the work is priced.
Commercial generator electrical planningWhat to send Kinzler
- Electrical drawings and generator / transfer-equipment specifications
- Loads to be supported and permitted shutdown windows
- Equipment supplier, startup provider and service responsibilities
- Project location, procurement requirements and bid deadline
Project names identify the work shown and do not imply customer endorsement. Photographs may show a particular work phase rather than a final installation.